Project Portfolio
A track record of precision bolting, Critical joints inspection and solution, Flange Management Solution roll-out across the region's most demanding assets — Refineries, offshore platforms, LNG terminals, and power plants.

PETRONAS Refinery Turnaround
Complete flange management for 180 critical joints during scheduled turnaround. Zero leaks achieved on hydro-test.

Petrochemical Plants Critical Equipment Commissioning
Critical Joint Specialist team was deployed twice yearly for detension, inspection, and installation for Double Cone Lens Ring Gasket for Reactor and Heat Exchanger since 2017.

H2S Reactor Manhole Flange Management
Full Flange Management inspection and tightening to verify bolt load with Ultrasonic for H2S Reactor Manhole under operation temperature 538°C.

Critical Joint Hot Bolting
Live hot bolting operations on onshore Petrochemical plants riser flanges at operating temperature exceeding 550°C with real-time yield monitoring.

Gas Processing Plant Commissioning
Full commissioning bolting scope and Critical Flange Inspection scope for new gas processing train including ASME B16.47 Series A large-bore flanges with FM Software.

Gas Processing Plant Commissioning
Full commissioning bolting scope and Critical Flange Inspection scope for new gas processing train including ASME B16.47 Series A large-bore flanges with FM Software.

Power Plant Heat Exchanger Retubing
Controlled bolt tensioning for high-pressure heat exchanger shell flanges with A193 B16 bolts at elevated temperature service.

LNG Terminal Expansion
Multi-phase bolting for cryogenic flanges including special gasket compression and low-temperature bolt material verification.

FPSO Topside Module Replacement
Critical path bolting for topside process module tie-ins during offshore hook-up campaign with 4-tensioner simultaneous ops.
Have a Similar Project?
Contact us to discuss your bolting requirements. We deliver the same precision and reliability to every project.
Discuss Your Project